19km from the Wiluna Gold Plant by existing haul roads
Gold mined from 7 shallow pits produced
  2.7Mt@ 2.3g/t Au for 163,000ozs (Chevron/Eon 1986-92)
 Open pits were mined for oxide material mostly to less than 50m. Most pits are open along strike.
Limited drill testing proved that depth extensions continue for at least 300m. Best intercepts include:
  14m @ 6.75g/t au
  13m @ 8.78g/t au
Primary down plunge targets identified need to be fully tested